While most of the other airports in Hilly region have normal visibility and normal operation of aircraft, Tumlingtar is facing the problem of weather.
The runway at Bharatpur Airport, which is currently 1300 meters long, will be expanded to 1650 meters.
The airport had all the emergency equipments standby after the aircraft declared the emergency.
The wing on the right hand side collided with the pole near the edge of Ramp on the Eastern side of the parking.
The aircraft has already got the company’s official Yeti Logo on top of NovoAir logo on its empennage.
When the airline operated 2 MA-60 and 4 Y-12 aircraft, it incurred a loss of Rs 1.90 billion from the fiscal year 2071/72 to 2075/76.
The new Runway at the airport, which had a grassland of one thousand one hundred meters, will be seven hundred meters long and twenty meters wide.
The aircrafts belonged to NovoAir, a private domestic carrier of Bangladesh before being purchased by Yeti Airlines.
This might be one of the best things to have happened to Nepalese aviation for quite some time.
Both the aircrafts departed from Hazrat Shahjalal International Airport in Bangladesh and flew directly to Kathmandu.